LUMA Design Co
Brisbane Property Styling
Quick Access
Updates
2.0Team view has three tabs: Cards, Day view (a zoomable timeline of the whole day) and Map (installs, pickups and the warehouse, with Navigate on each pin).
Aug 2026
2.0Photography deadline pulled from Monday and shown on the job tiles, the scheduler and the team view.
Aug 2026
2.0Labels print on the 62 × 42mm sheet, 18 per page. The second sheet size has been retired.
Aug 2026
1.9Jobs without a date go On Hold instead of getting an invented one, and labels print DATE TBC. Remove a date from the calendar icon to put a job on hold.
Aug 2026
1.9Assign or change a job's stylist straight from the job panel.
Aug 2026
1.8Stylists can download a job summary PDF — the packing slip layout plus every note and item photos.
Aug 2026
1.8Cushion bags and accessory tubs count as items on the driver's loading bar, and the bar shows bay staging separately from truck loading.
Aug 2026
1.7Monday pull keeps property details in step, moves finished jobs to Completed, and holds jobs whose date is cleared.
Aug 2026
1.7Deliveries lines can be corrected in place, including the Programma status.
Aug 2026
Damage reports section added — log and track furniture damage with photos.
Jul 2026
Runsheet has its own page with the full grid, crew management and tasks.
Jul 2026
—
Active Jobs
—
On Runsheet Today
—
Damage Reports